K-12 Education
Return to K-12 Education
Return to portfolio
The initial phase with construction completed, involved re-roofing of the existing building. The major project, for which design was completed, includes:
Performing Arts and Science Classroom Addition:
45,600 SF addition including 800-seat auditorium with performance stage geared to musical theatre, choral music / theatre arts room, band room, practice rooms, instrument storage, art room, guidance suite, offices, storage and support spaces. The science floor includes labs for general science, biology, chemistry, physics, a lecture hall and two additional classrooms.
Renovations: Throughout existing building, including:
Toilet room upgrades, redesign of main office area, including new Nurse’s Suite, main entrance, and Lobby area, locker replacement.
The existing steam heating system replaced with new dual fuel hot water heating boilers, new underground fuel oil storage tank, and dual-temperature fan coil units to serve the existing classroom areas. The Air Conditioning system will consist of a packaged air-cooled chiller and pumps to serve the new addition and the fan coil units in the existing building.